This question was closed without grading. Reason: Answer found elsewhere
Nov 3, 2014 21:20
9 yrs ago
1 viewer *
English term

car

English to Romanian Other Metallurgy / Casting
1.3Verify that the position of the trace number. Should be in the upper part of the flange where the 2 Feed Thru of the tunnel point.

2.0 Place the meter in the ½”- 4” ***car*** fixture with rollers, for the other sizes the ***car*** is placed in the work station.
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search